Sourcing & export service
Specification & Quality Planning
Material, tolerance, finish and packing requirements need to be recorded clearly so the buyer and supplier work to the same acceptance basis.
Most quality problems in China sourcing are decided before the first part is made. A drawing with an unmeasurable tolerance, a "stainless steel" with no grade, a surface finish described by adjective rather than standard, a packing instruction that arrives after the goods are packed — none of these can be inspected out later.
This service works on that part of the chain. We write the requirement to a level that can actually be checked, verify that the factory is equipped to hold it, get a sample or first article in front of you before production starts, and record what remains outside anyone's control so you can appoint inspection where it earns its place.
Stage
Quality Planning
Who it is for
- Buyers who have received goods that met the drawing on paper but failed in use
- Companies entering a category where the difference is invisible in a photograph
- Procurement teams that need a repeatable specification, not a one-off order
Applied to these categories
Deliverables
What you receive
These are documents and answers, not promises. If any of them is not produced, that is a failing on our side and should be raised as one.
- 01
A specification written to a testable level: material grade, tolerance, surface treatment, packing and marking, each with the method that would confirm it
- 02
The supplier checked against that specification — equipment, process, and whether your item is a core production line for them
- 03
A sample or first article arranged and submitted for your approval before the production run
- 04
The supplier's own material and test certificates passed on where they exist, with the scope of each certificate stated
- 05
A written statement of what stays outside our control, so that inspection or testing can be appointed by you where it matters
How it runs
The stages, in order
Each stage produces something you can read or check. That is the point of separating them — a stage with no output is a stage nobody can hold to account.
- 01
Write the requirement so it can be checked
Material grade, tolerance class, surface treatment, packing and marking — each stated with the standard it refers to and the method that would confirm it. Where a requirement cannot be measured, we say so rather than letting it pass into the order as an adjective.
- 02
Check the supplier against it
Equipment, process capability and whether your item is a core production line for this factory. Where a certificate or test report is claimed, we ask for its scope, because a system certificate and a product certificate answer different questions.
- 03
Approve a sample before the run
A sample or first article, measured against the written requirement, submitted for your written approval. What you are approving is stated on the document, and so is what the approval does not cover.
- 04
Agree the evidence pack
Which certificates, test reports and packing lists travel with the goods, in what form, and who receives them. Agreeing this before production is easier than arguing about it after arrival.
Boundaries
What this service does not include
Stated here rather than discovered later. If any of these is essential to your programme, it needs a different arrangement — and we would rather plan that with you at the start than explain it after a shipment.
Full quality & risk statementWe do not perform inspection or testing at any stage. A sample approval is not an inspection regime, and it does not replace the inspector you appoint.
We do not certify conformity. We pass on the supplier's own certificates and state their scope; the acceptance decision remains yours.
We do not change your engineering requirement. Where something cannot be measured as written, we propose a measurable equivalent for your engineer to approve or reject.
Common questions
Quality Planning — asked often
Is this pre-shipment inspection under a different name?
No, and the difference is the point. Inspection happens at the end, on a batch that already exists, and it can only reject. This work happens at the start, on documents and on a sample, and it is the only stage where a problem can still be designed out. If you want goods inspected before shipment, that is a separate appointment and we will coordinate the inspector you choose.
What happens if we reject the sample?
The factory gets a written list of what failed against the requirement and revises, or we stop and re-shortlist if the failure shows the process cannot hold the tolerance at all. Either way the conclusion is recorded in the file, so the same question is not reopened three batches later.
Can this be done with a supplier we already use?
Yes, and it is often the most useful case. An existing supplier is usually working to an agreement that was never written down precisely — the drawing plus a conversation. Writing the requirement down and having a first article measured against it tells you whether the parts you have been receiving were conforming or merely acceptable.
Where it applies
Industries that use this most
Next stage
Talk to us about quality planning
Tell us where your project stands and what you have already tried. A named person replies within one business day, including when the honest answer is that this service is not what you need.
We reply within 1 business day — from a named person, not an auto-responder. Your requirement is confirmed first; the quotation follows once details are agreed.