Sourcing & export service
Custom Manufacturing Sourcing
Your drawing needs a suitable manufacturing route and a supplier able to work to the specified material, geometry and tolerances.
Custom parts are bought on a drawing, so the drawing is the product. Most of the problems we see are not manufacturing failures — they are drawings that left a tolerance unspecified, a process route undecided, or a critical feature unmarked, and a factory that filled the gap with its own assumption.
We start by reading the drawing the way a factory will read it, and tell you what is missing before it goes out. Then we match the geometry and the volume to a process route, because the same part can be machined, cast, stamped or moulded to very different tolerances.
Stage
Custom Manufacturing
Who it is for
- OEMs needing parts they cannot buy off the shelf
- Companies transferring an existing part to a new supply source
- Product developers moving from prototype to production volume
Applied to these categories
Deliverables
What you receive
These are documents and answers, not promises. If any of them is not produced, that is a failing on our side and should be raised as one.
- 01
Process route recommendation (machining, stamping, casting, moulding, fabrication) with the reasoning and the tolerance each route can hold
- 02
Tooling and setup stated separately from the part, with ownership of the tooling clarified
- 03
Tolerance and inspection-method agreement recorded before production, not after
- 04
First-article sample sent for your approval where the drawing allows
How it runs
The stages, in order
Each stage produces something you can read or check. That is the point of separating them — a stage with no output is a stage nobody can hold to account.
- 01
Review the drawing before RFQ
Tolerances, datums, critical features, material condition, surface finish and inspection method. Gaps are raised with you first, because a factory that guesses will quote confidently and produce something else.
- 02
Choose the process route
Volume, geometry and tolerance together decide whether machining, casting, stamping, moulding or fabrication is economic. We quote the route that fits, and where a different route would serve better we raise it before the order rather than after.
- 03
Keep tooling as its own line
Tooling, setup and the part itself are quoted as separate lines, with ownership and retention stated. A single blended figure hides the decision about whether the tooling ever pays back.
- 04
Approve a first article
Where the drawing allows, a first-article sample is produced for your approval before the production run. It is the fastest way to catch a drawing interpretation problem, and far less painful than a rejected batch.
Boundaries
What this service does not include
Stated here rather than discovered later. If any of these is essential to your programme, it needs a different arrangement — and we would rather plan that with you at the start than explain it after a shipment.
Full quality & risk statementWe do not perform dimensional inspection or issue first-article inspection reports. A dimensional report from the factory is the factory's own measurement, and we describe it as such.
We do not provide design engineering. We can tell you what a factory will struggle to make and why, but the design authority stays with you.
We do not own the intellectual property in your drawing, and we do not warrant that a part made to your drawing will perform as designed. That warranty sits between you and your design.
Common questions
Custom Manufacturing — asked often
What files do you need for a custom part?
A dimensioned drawing with tolerances and a revision number, the material and surface treatment, the quantity, and a STEP file if one exists. A STEP file alone is not enough, because it carries nominal geometry without tolerances — and the tolerance is usually where the argument lives.
Can you help choose between machining and casting?
Yes, and it is often the most valuable part of the conversation. Machining needs no tooling and suits low volume and tight tolerance; casting needs tooling and wins at higher volume with looser as-cast tolerance, usually followed by machining on critical features. The break-even is specific to the part, so we ask for the annual quantity and let the factories quote both routes where both are viable.
Who owns the tooling?
It should be you, and it should be in writing before the first order. In practice the tool is often held at the factory, and retrieving it can be harder than expected. We record ownership, condition and transfer terms at the point of the order, because that is the only moment when the conversation is easy.
Where it applies
Industries that use this most
Next stage
Talk to us about custom manufacturing
Tell us where your project stands and what you have already tried. A named person replies within one business day, including when the honest answer is that this service is not what you need.
We reply within 1 business day — from a named person, not an auto-responder. Your requirement is confirmed first; the quotation follows once details are agreed.